Great Schwimmer [with test wiring behind]
Manual keyboards
Swell pipes [basses]
Swell pipes [trebles]
Swell Schwimmer, blower and reservoir top
4.6.20 factory visit7
Bampton chests, building frame and Pedal pipes in position 16 Aug 2019 (1)
Bampton chests, building frame and Pedal pipes in position 16 Aug 2019 (2)
Bampton wind reservoirs now made
9.7.20 parts arrival4